The next step is not slipping because you are slow. It is slipping because it is not a step yet.
A step that slips usually has one of three problems. First, the decision underneath it has not been made. The work cannot move until someone decides, and no one has said the decision out loud. Second, the step has no name next to it. Everyone agrees it should happen, and no one is responsible for making it happen. Third, the step has no time. “Soon” is not a time. A step without a date is a wish, and wishes slip.
Check which one it is. Say the decision in one sentence. If you cannot say it in one sentence, the decision is not ready — and that is the work. Then put a name next to the step, and a date on it. A step with a decision, a name, and a date does not slip. It either happens or it is missed, and a missed step can be seen and dealt with.
That is what the session is for. Ninety minutes, the owner in the room, the work that will not move on the table. You leave with the decision stated and the plan written down — short enough to use on a Tuesday.
The cost of a slipping step is not the delay. It is the quiet it creates: the team learns that plans do not hold, and stops believing the next one. A step that moves, even a small one, teaches the opposite. That is why the plan is short and the date is real — belief is rebuilt one kept step at a time.
If the step keeps slipping after that, look at the rhythm, not the people. A team that keeps missing steps usually has no cadence: decisions pile up between meetings, and the pile grows until nothing moves. The fix is a time and a place for decisions, every week — not a better to-do list.
So: name the decision, name the owner, name the date. Then watch the step move.